Every flight, planned from the ground up.
Anyone can fly a drone; flying one safely and legally is the hard part. A flight takes under two hours on site, but the planning behind it is what makes the difference. Here is the whole process, the permissions we arrange, the paperwork you'll see, and a worked example from first email to finished photos.
Six stages, from first question to finished photos.
- Day 1
Enquiry
You tell us the job, through the job checker or by email.
- Days 1 to 3
Quote
A written quote for your site, with our terms and what you'll receive.
- After you accept
Assess
We study the site, the airspace and the risks, desk-based first.
- Up to 3 weeks
Permissions
The most work for us and none for you: we ask, chase and confirm in writing.
- Flight day
Fly
Weather checked, site walked, crew briefed, then the flight.
- Within a few days
Deliver
Edited, labelled photos and video, sent by download link.
A roof inspection near Southampton Airport.
This is an illustrative job, typical of the work we do. It is a semi-detached house about 3 km from the airport, so it sits inside the airport's flight restriction zone: the case that needs the most planning.
- Client
- Homeowner, at home
- Job
- Roof & gutter inspection
- Concern
- Damp patch in a bedroom
- Drone
- DJI Mavic 4 Pro
- Crew
- Pilot and observer
- Time on site
- About 90 minutes
1. The site plan
Before any permission is asked, we draw the site from maps and aerial imagery: where we take off, where the drone will fly, who could be nearby and how we keep them clear.
2. The timeline
The airport permission sets the pace. Southampton asks for at least 14 days' notice, so we apply as soon as you accept the quote and choose a flight date about three weeks out, with a reserve day in case of bad weather.
3. What happened, step by step
Days 1 to 3: quote and consent
The homeowner used the job checker. We sent a written quote with our terms of business. She signed the acceptance sheet and a site permission form, giving consent to fly over her property and choosing whether the photos may be used in our portfolio. Because the roof is shared, we also wrote to the neighbour.
Days 3 to 5: desk assessment
We drew the site plan above, checked the airspace on the official UK aeronautical charts and the current airspace notices, and wrote the risk assessment: the garden as take-off point, the pavement as the area to watch, power lines and trees noted, and what we would do if anything went wrong.
Day 4: permissions requested
We applied to fly inside the airport's flight restriction zone through the NATS online service, and told the military low-flying team when and where we'd be flying so their crews could plan around us. Nothing else applied: no railway, council land or protected sites nearby.
Days 18 to 21: approval and weather
The airport's approval arrived with conditions and a number to call on the day. We watched the forecast from three days out, confirmed with the client the day before, and kept the reserve day free in case the wind picked up.
Day 21: the flight
Arrived early, walked the site, briefed the observer, phoned the airport's control tower before take-off as the approval required, and flew three short flights around the roof. We told the tower when we'd finished.
Day 24: the results
140 labelled photos and a short video. They showed a cracked lead flashing by the chimney above the damp bedroom. The homeowner passed them straight to her roofer, who quoted without needing scaffolding to look.
Who we ask, and when.
Permissions are the biggest part of the planning. One job can need answers from an airport, the port, the council and the landowner, each with its own forms and notice periods. It takes a lot of effort, but it always gets sorted, and it's our job, not yours: we check every site against the same list, contact everyone, chase every answer, and don't fly until each one is in writing.
The property owner
Written consent from the owner or occupier to take off from and fly over the property. Where a roof is shared, we ask the neighbour too.
Signed before we bookAirports
Southampton and Bournemouth airports are surrounded by flight restriction zones. Flying inside one needs the airport's permission, applied for through NATS, and a call to the control tower on the day.
At least 14 days' noticePort of Southampton
ABP runs the Port of Southampton and is the harbour authority for Southampton Water. Flying from or over the docks and quays, or close to ships and terminals, needs the port's agreement, so we contact ABP before planning any waterside job there.
Ask earlyMilitary sites
Some military sites have protected airspace that needs the site's own permission. Separately, we tell the military low-flying team about our flights so their aircrews can plan around us.
Notice depends on the siteRailways
Network Rail is notified of any flight close to the railway. We'll tell you at the quote stage if your site is affected, as it can change what's possible.
Checked at quote stageCouncils and public land
If we need to take off from or fly over council land, such as parks, open spaces, car parks or highways, we ask the council that owns it first: Southampton City Council inside the city, or the borough, district or county council elsewhere. For roads, we plan so the flight can't distract drivers.
Usually 1 to 2 weeksNational Trust and New Forest
The National Trust and Forestry England have their own permission routes. Drones aren't allowed on New Forest Crown land from March to August, while birds are nesting.
Seasonal limits applyChurches and listed buildings
No extra flight permission is needed for a listed building, but we agree access, timing around services and events, and consent with whoever looks after it.
Agreed before we bookTemporary restrictions
Events like the Southampton Boat Show can bring temporary airspace restrictions. We check the official notices when we plan, and again on the morning of the flight.
Checked twiceHowever many people need asking, you deal with one.
Our process for applying is well established: we know who to contact for each site, what each body asks for and how much notice it needs. We handle every form, phone call and follow-up, and keep you updated until every permission is confirmed.
What's written down, and why.
Every job has its own file. You sign two short documents; the rest is our planning record, and you're welcome to see any of it before the flight.
Quote and terms of business
What we'll do, what you'll receive, the price and our standard terms.
We sendAcceptance sheet
One page confirming the job, the date range and payment.
You signSite permission and consent form
Your consent to fly over the property, and your choice on whether we may use the images in our portfolio.
You signSite assessment and risk assessment
The site plan, hazards, take-off point and how we keep people clear.
Our recordAirspace briefing
The official charts, notices and restrictions in force for your site and date.
Our recordPermission record
Every request we sent and every written answer, kept with the job.
Our recordFlight plan and flight card
Heights, routes, camera settings and the one-page card the pilot carries.
Our recordEmergency plan
What we do if the drone, the weather or the site doesn't behave as planned.
Our recordFlight log and delivery
The record of each flight, your images, and the invoice.
We sendWhat the day looks like.
Times are from the example mission. You don't need to do anything except be reachable, and keep people and pets indoors while we fly if you can.
Wind, rain, visibility and the airspace notices, against the drone's limits. If it's a no, we tell you now and move to the reserve day.
We check the take-off point, look for anything the plan missed, and say hello.
Pilot and observer go through the plan, the emergency drill and the keep-clear areas. Pre-flight checks on the drone.
When the approval requires it, we phone the control tower before take-off.
Usually two or three short flights, with battery changes in between. The observer watches for people and aircraft the whole time.
We tell the tower we've finished, check the images on site, and pack up.
Photos follow within a few days.
The limits behind every flight.
Maximum height above the ground
Visual line of sight: the drone is kept in direct view at all times
From people not involved, or 5 m in low-speed mode, under our A2 certificate
For our current drones, and never wind above a drone's limits. The Matrice 4TD, coming soon, can fly in light rain
Public liability insurance on every flight
A flight plan and risk assessment for every job
We plan with extra margin on top of these limits, and the pilot can stop a flight at any point if conditions change. Everything on this page comes from our own operations manual. Open Category flying doesn't require one, but we follow it on every job. Our Remote Pilot Certificate (RPC-L1) is in progress: the theory exam is passed and the practical assessment is booked for this November.